Bulletin 2
Since our last Bulletin covering the planned refurbishments. The water leak has been repaired (@ £1200) and the Main Hall plus Toilets, Entrance Hall and Bar have been painted. Some 20 volunteers came along throughout the 2nd to 7th January work period and everyone worked very hard to get the decorations finished in the time slot.
When you read this the Fire Protection Scheme and new outside lighting will have been installed and commissioned (@ £5500). We are now seeking quotes for resurfacing the Main Hall Floor.
A series of fund raising events are planned for 2006 and some of them are shown in the Diary section of this website.